NCC Award Peppers Inmetro Certification on their complete range of IEC Glands. The certification is yet another national accreditation to the Peppers “World Class” range of Cable Glands and accessories. On the back of this Peppers have appointed a distributor to handle it’s business in Brazil. The
Read more →Yearly archive for 2009
The Ambuklao Hydroelectric Plant is the Philippines’ first hydroelectric plant. It is located in the mountains of Bokod, Benguet and is about 36 kilometers northeast of Baguio City. The plant was commissioned by National Power Corporation in 1956 with an installed capacity of 75 MW. In July
Read more →Greater Gabbard will consist of 140 wind turbines each with a capacity of 3.6MW which will give the entire project a maximum capacity of 504MW. The project is going to be located approximately 23 km off shore next to two sand banks known as Inner Gabbard and
Read more →BSI have audited and awarded Peppers QMS certification to ISO 9001 2008.
Read more →Peppers is awarded the supply of cable glands to the Fujairah F2 project, which is on schedule to be completed in 2010, and will be the largest power and water co generation plant in the UAE.
Read more →Ex nR Certification SIRA Certification have awarded Peppers Ex nR (restricted breathing) certification on our complete IEC certified range of cable glands. This includes the popular A2LF, E1WF, CR-1 and CR-C Barrier glands. Certificate # SIRA 09ATEX1221X peppers_sira_09atex1221x_exnr
Read more →Peppers achieves Russian Maritime certification on it’s complete range of “Ex” certified cable glands. Certificate # 09.00784.011 rmrs_certificate_09 00784_011
Read more →Non Barrier Glands Certificate # 09-LD463991-PDA ABS_PDA_Elastomeric_Glands Barrier Glands Certificate # 09-LD463991A-PDA ABS_PDA_Barrier_Glands
Read more →